The project was contracted by SUMEC engineering in the form of EPC (Engineering, Procurement, Construction) general contracting. It was successfully connected to the grid and put into operation in January 2023. It can supply 145 million kilowatt-hours of electricity to the local power grid every year, meeting the annual electricity consumption needs of 15,000 local households and greatly alleviating the local electricity shortage.