Environmental Remediation Project
Provide full scale services for environmental remediation and ecological restoration including project consulting、engineering design、Construction work、construction and project contracting. Market sectors include soil and groundwater remediation and risk control、brownfield development、mining、watershed restoration、landfill management and industrial park environmental improvement and management.

Lianshui Black and Odorous Water Treatment Project
The project is about 1.5 kilometers long, about 10 - 30 meters wide, and the water area is about 45,000 m². After the completion of the project, it will help improve the regional water system environment.
Soil Pollution Remediation Project of the Original Site of Nanjing Bicycle General Factory
SUMEC engineering completed the remediation task successfully in just 27 days, with a remediation area of 35,123 m³.


Soil and Groundwater Remediation Project of the Original Coal Gasification Plant Plot in Nanjing
The total volume of contaminated soil is approximately 79,000 m³, and the total volume of groundwater is 42,000 m³. It is the largest single-unit gas thermal desorption project in China.
EPC General Contracting Project of the Closure and Ecological Restoration of Liuhe Municipal Solid Waste Landfill Site
The area of the restoration project is 60,000 m³. The designed storage capacity is 1,005,000 m³ (equivalent to about 912,500 tons), and the daily treatment capacity of domestic garbage is 250 tons.


Ningbo Dingjiawan No. 3 Plot Land Pollution Remediation Project
This plot was originally a production factory of zinc-manganese dry batteries of Ningbo Shuanglu Holding Group Co., Ltd. The plot is contaminated by heavy metals such as cadmium, nickel and manganese. The volume of contaminated earth is 18,000 cubic
Jiadong Village Plot environmental Renovation Project
The project adopts the coordinated disposal technology of cement kilns and the chemical oxidation process after dewatering by precipitation wells and excavation pumping. Approximately 48,000 cubic meters of groundwater has been generated and treated